Arabic Chinese French Spanish Russian JOBS   FAQ   LINKS contact us  sitemap


 Progress Reports
Funds Committed
and Disbursed
• Grants overview (Excel)
• Grants in detail (Excel)
• Customize your own report
• Disbursements in detail (PDF)
Donors' Pledges and Contributions (Excel)
Global Distribution of the Portfolio over seven rounds
GET OUR FREE NEWSLETTER
   » Read the latest issue



Partners in Impact Forum
12-14 March 2007

5 Year EvaluationVenue:

Hotel Victoria
Route de Caux
CH-1823 Glion sur Montreux
Switzerland
Tel: +41 21 962 8282
Fax: +41 21 962 8292
http://www.victoria-glion.ch




Introduction

Under the oversight of the TERG, the Five-Year Evaluation is a major effort to review the functioning and performance of the Global Fund as an institution and a partnership, and to identify areas of strength and weakness that will lead to improving day-to-day operations.  One of the most unique aspects of this evaluation is its attempt to measure impact – that is, to assess the reduction in the burden of HIV, TB and malaria associated with the collective scale-up of prevention and treatment activities by all partners.  The Impact Evaluation will take place in 20 countries, with 8 countries engaging in an in-depth analysis including primary data collection as appropriate and 12 countries where impact analysis would be based on secondary data.  The TERG has short-listed 11 countries as candidates for in-depth impact evaluation as listed below.  



Region Country
East Asia & Pacific 1. Cambodia
Eastern Europe & Central Asia 2. Moldova
Latin America & the Caribbean 3. Haiti
4. Peru
South Asia 5. India
East Africa 6. Ethiopia
7. Tanzania
Southern Africa 8. Malawi
9. Zambia
West & Central Africa 10. Burkina Faso
11. Ghana

Impact Evaluation Task Forces

The Global Fund is pleased that UNAIDS has agreed to actively support the establishment of ‘Impact Evaluation Task Forces’ as the prime body coordinating in country impact evaluation activities in each of the 11 countries.  These Task Forces will draw from local expertise and institutions to the greatest extent possible including government representatives, civil society representatives, technical partners, local universities and research institutions.  UNAIDS will act as a catalyst at country level to stimulate partner dialogue and analysis of existing information for impact evaluation activities for all three diseases.



The Partners in Impact Forum

Four representatives from each Impact Evaluation Task Force are invited to participate in the ‘Partners in Impact Forum’ – a milestone in the Five-Year Evaluation effort. The Forum brings together both country level stakeholders and global partners involved in HIV/AIDS, tuberculosis and malaria impact evaluation activities. Country representatives and technical partners will present and discuss current and planned impact evaluation efforts in each country. The chief outcome of this event will be the refinement and reinforcement of each country’s impact evaluation plan, as an essential element of the Five-Year Evaluation.

Agenda 238 KB

Participants List 120 KB

Forum Logistics 55 KB

Guidance to Country Delegations for Document Preparation 222 KB

Presentation Template for Country Delegations 876 KB



Introductory Presentations

Introduction to the Five-Year Evaluation 264 KB

Introduction Day 2 2.5 MB

Introduction Day 3 1.3 MB

Overview of Study Areas 1 & 2 927 KB



Results of Group Work

Group 1: Burkina Faso / Haiti 26 KB

Group 2: Ethiopia / India / Tanzania 24 KB

Group 3: Cambodia / Moldova / Peru 20 KB

Group 4: Ghana / Malawi / Zambia 35 KB



Country documents and presentations

Country Documents & Presentations (PDF files)
Burkina Faso PIF Presentation
  Indicateurs PIF
Cambodia PIF Presentation Final
  Proposed remedial plan
  HIV/AIDS indicators
  TB indicators
  Malaria Indicators
Ethiopia PIF Presentation Final
  HIV matrices
  TB matrices
  Malaria matrices
Ghana PIF Presentation
Haiti Final presentation
  TB Indicators
  PIF Malaria Indicators
  HIV Indicators
India PIF Presentation
Malawi PIF Presentation
  Annex 1 – Indicator matrix for impact assessment plan
  Annex 2 – Comprehensive Impact Assessment Plan
  Annex 3 – Mapping of Impact Studies
  Annex 4 – Malawi Task Team on Impact Assessment – workshop output
  Annex 5 – Malawi triangulation report on HIV prevalence and coverage
  Annex 6 – Concept paper on HIV-Related Impact Evaluation and Research
  Annex 7 – Malawi HIV Universal Access Targets Final Report
  Annex 8 – Malawi HIV M&E Situation Analysis Matrix
  National workplan & budget - Impact assessment
Moldova Presentation
  HIV component
  TB component
  M&E plan HIV/AIDS
  M&E plan TB
  Review of NAP
  M&E Strategy HIV/AIDS
  M&E Strategy HIV/AIDS Operations Manual
  Development of M&E Software for HIV/AIDS
  TB/HIV/AIDS M&E SYSTEM Country Impact Evaluation Report
  Indicators final
  Costing
  MD AIDS AideMemoire 
Peru Presentation
  PIF Preparation
  Ensayo de Presupuesto
  Presentation (English)
  PIF Preparation (English)
  Ensayo de Presupuesto (English)
Tanzania PIF Presentation Final
Zanzibar (Tanzania) PIF Presentation Final
Zambia PIF Presentation
  Gap Analysis of Monitoring and Evaluation Systems

For any enquiries regarding logistics and administrative arrangements, please contact Fortunate Mendlula at +41 22 791 5927 or .

For further information on the Five-Year Evaluation please contact Dr Serge Xueref, Manager Evaluation and Scientific Policy at +41 22 791 8208:



QUICK LINKS
© 2002 - 2008 The Global Fund to Fight AIDS, Tuberculosis and Malaria. All Rights Reserved.
Contact the webmaster: | Read the Disclaimer